Let’s talk ↗
← ALL EQUIPMENTPACKAGE & CONNECT

Packaged electrical systems

Prefabricated substations and coordinated conversion and step-up equipment, with agreed supply interfaces.

Conceptual rendering: Packaged electrical systems
Illustrative rendering · configuration selected per project
SubstationsTransformation & distribution
ConversionStorage power interfaces
Step-upSite-to-network connection
THE EQUIPMENT FAMILY

One package. Clear boundaries.

Factory-assembled packages combine electrical stages. Agree what is included, tested together and completed on site.

01

Prefabricated substations

Packages combining MV switching, transformation and LV distribution in the selected configuration.

02

Power conversion & step-up

Coordinate storage converters, transformers and switching interfaces.

03

Project integration

Match the package to the battery, facility and grid connection. Agree equipment and integration responsibilities.

TECHNICAL CONSIDERATIONS

Select on the right basis.

Confirm ratings, compliance evidence and availability for the selected model.

REPRESENTATIVE SELECTION DATA

Containerised conversion & step-up

ParameterFamily / selection basisProject consideration
Published power range0.5–3.75 MWConverter and transformer capacity are selected together.
Electrical interfaces800–1,500 V DC; 400 / 690 V ACConfirm the battery voltage window and converter pairing.
Grid connection10 kV; 35 kV optionIncludes dry-type step-up and MV switching; battery system is separate.

Selected containerised variant in manufacturer material reviewed August 2026. These ratings do not apply to every packaged substation. Grid-code acceptance remains project-specific.

Request the model datasheet ↗
Project selection checklist
ParameterFamily / selection basisProject consideration
Package boundaryIncluded equipment and external terminalsDocument converter, transformer, switchgear, auxiliary and control scope.
Electrical arrangementConnection voltages, capacity and fault dutyCoordinate with the site design and point of connection.
Enclosure & environmentInstallation setting and operating conditionsConfirm footprint, ventilation, access, corrosion protection and maintainability.
ControlsBMS, PCS, EMS and site/network interfaces as applicableAgree integration ownership, protocols and acceptance criteria.
Factory acceptanceTests on included equipment and assembled interfacesDistinguish equipment testing from complete system acceptance.
Site responsibilitiesFoundations, cabling, earthing, installation and commissioningOnly explicitly agreed works belong in the supply package.
APPLICATIONS

Start with the operating duty.

01

Storage connections

Coordinate the conversion and step-up stage around the selected battery system.

02

Facility infrastructure

Bring transformation and distribution together where a packaged approach suits the site.

03

Renewable interfaces

Assess the voltage, control and connection requirements alongside the generation architecture.

PLAN YOUR ENQUIRY

Useful details
for your enquiry.

  1. Required capacity, incoming/outgoing voltage and single-line arrangement
  2. Battery or generation interfaces and control requirements
  3. Site layout, access, environmental and installation constraints
  4. Scope split for civil works, cabling, commissioning and acceptance
COMMON QUESTIONS

Before you
specify.

Does packaged mean turnkey?

No. The quote defines included site works and responsible parties.

Does one certificate cover the whole package?

No. Each relevant item and the assembled system need evidence for their configuration and application.

START WITH THE REQUIREMENT

Let’s define the scope.

Tell us what you’re planning.
Technical details can follow.

Discuss your project ↗