Medium-voltage switchgear
Feeder, switching and protection options, including ring-main and circuit-breaker configurations where suitable.
Medium-voltage switching and low-voltage distribution for your electrical and protection requirements.

Start with the single-line diagram, prospective fault duty and operating requirements. We align these with manufacturer documentation and supply boundaries.
Feeder, switching and protection options, including ring-main and circuit-breaker configurations where suitable.
Incoming and outgoing assemblies selected for the load, fault duty and operating requirements.
Coordinate switchgear with transformers, prefabricated substations and storage conversion equipment.
Confirm ratings, compliance evidence and availability for the selected model.
| Parameter | Family / selection basis | Project consideration |
|---|---|---|
| Rated voltage | 3 / 6 / 7.2 / 12 kV | 50 Hz series; selected configuration to match the network. |
| Rated current | 630–4,000 A | Rating depends on the selected assembly. |
| Short-time withstand | 16–50 kA for 4 seconds | Confirm the tested voltage, current and fault-duty combination. |
Representative manufacturer series data, reviewed August 2026. Select ratings together; the published range does not establish site acceptance or internal-arc classification.
Request the model datasheet ↗| Parameter | Family / selection basis | Project consideration |
|---|---|---|
| System rating | Voltage, frequency and continuous current | Select around the project single-line diagram and operating duty. |
| Fault duty | Prospective fault level and required withstand | Verify the exact assembly and device configuration. |
| Protection | Breaker/fuse selection, relays and coordination | Protection studies and settings have a defined engineering responsibility. |
| Operation & access | Interlocking, isolation and maintenance requirements | Confirm the operating sequence and site access philosophy. |
| Controls & metering | Signals, communication and interface requirements | Agree the point list, protocols and responsibility for integration. |
| Evidence | Selected assembly’s test and documentation basis | Do not infer an internal-arc classification or approval from another configuration. |
Connect site supply to the transformation and downstream distribution arrangement.
Coordinate access, isolation, metering and ongoing operational requirements.
Define the MV/LV interfaces within a factory-assembled package.
No. Check the exact tested assembly, installation arrangement and required classification.
This offer covers MV switchgear and LV distribution. Rack PDUs and busway are shown as system context; supply requires separate qualification.
The project engineer and equipment suppliers agree responsibility. Switchgear supply does not include a complete site protection study unless expressly agreed.
Tell us what you’re planning.
Technical details can follow.